In June 15th, Saudi Arabia (Tianjin) petrochemical project 35 thousand / styrene styrene recovery smoothly in the extraction unit.
This set of equipment construction address is located in the Tianjin Binhai New Area (port) and Saudi Arabia (Tianjin) Petrochemical Co., Ltd., the construction scale for 3.5 million tons / year styrene extraction unit (nominal). Device mainly comprises a device blocks, eight carbon cutting unit, phenylacetylene and hydrogen unit, styrene extraction unit, refining styrene unit, utilities, middle tank, pipe, a loading station, refrigerating station, local cabinet, distribution, analysis laboratory, waste water, plant to the drainage pipe network transformation. Construction of pile foundation construction began in April 30, 2015, to June 15th, the construction lasted 413 days.